The Award Winning Arctic Driver: Under Pressure Ferrule Extraction Equipment
The freezing and ferrule replacement operation takes no more than 20 minutes. Where shut-off “penny ferrules” types are encountered there is no need to freeze and the job time is reduced by 10minutes.
Features
- One Saddle covers 3”- 14” Mains
- Suits Cast Iron, Ductile Iron, Steel, PVC, PE & Asbestos Cement
- 16 Bar Line Pressure
- Lightweight equipment
- Minimises mains system chlorination
- Low consumable item costs
- Reusable Saddle Access Point
- Re-drill under pressure to increase flow
Benefits
- No supply interruption
- No risk of disruption & DG7 noncompliance
- No risk of knock on burst on recharge
- No need to use expensive stopple techniques
- No customer notification
- Easy to use – lower labour costs
- Lower risk of lane rental charges
- Quick repairs 10-20 minutes
- No depressurising the main
- Sediment not disturbed, therefore no discolouration
- Calm Networks Approach